What a GC Actually Checks on a Certificate of Insurance, in Order
Ninety seconds is about what a competent reviewer gives a certificate. They are not reading it. They are running the same twelve checks they run on every one, in the same order, and the first failure ends the review.
That sequence, and what fails at each step.
- The legal name of the named insured against the subcontract.
Acme RoofingandAcme Roofing LLCare different legal persons, and coverage for one is not coverage for the other.
- The insurer, not the producer. Captive programs, risk retention groups and non-admitted surplus lines carriers all appear on real certificates, and an exhibit that prohibits them or sets a financial rating test is checking this line.
- Policy period against the work dates. A certificate expiring mid-project is a lapse scheduled in advance.
- Coverage lines. General liability, auto, workers compensation, umbrella, whatever the exhibit lists. The additional insured box on a general liability certificate does nothing for the auto policy.
- Limits, line by line. Occurrence and aggregate for general liability, combined single limit for auto, statutory limits and employer's liability for workers compensation, the excess limit on top.
- Products-completed operations aggregate. Blank more often than anyone expects. Blank or zero means the hazard may have been excluded, which matters for construction and hardly at all for office work.
- Additional insured. The check mark confirms an endorsement exists and nothing more. Which form, whether your entity is on the schedule, whether completed operations is included: all of it waits for the endorsement pages.
- Waiver of subrogation. The same limitation, and a worse consequence. A checked box here says nothing about the workers compensation policy, where a separate waiver is what actually matters.
- The cancellation line. Standard CGL language gives ten days on a nonpayment cancellation and thirty on any other. Contracts asking for thirty in every case need an endorsement, not a new certificate.
- The certificate holder. Exact entity, exact address. Notice goes where the certificate says it goes, and nowhere else.
- Signature and date. An unsigned certificate, or one dated three years ago, is a document that makes no reliable claim about today.
- The producer's contact details, so the rest of the file can be requested without hunting.
What none of that establishes
A certificate says what a policy looked like on the day it was issued. It does not know whether the policy has since been cancelled. It does not know whether paid claims have eroded the limits. It does not know whether a mid-term endorsement replaced the form named in the file. And it says nothing about the rest of the subcontract's requirements.
The distance between the document in the drawer and the coverage that exists today is the reason certificate tracking is a process rather than a filing system.
Differences worth accounting for
Not every project uses an ACORD 25. Many owners and larger GCs require their own certificate form, a contractor management portal, or both.
Exhibits also scale with the project. A tenant improvement and a ground-up have almost nothing in common except the word insurance, and the limits in one will look absurd in the other.
Workers compensation is statutory, with the limits set by each state, and a small number of states let employers opt out entirely. A certificate with no workers compensation line is a defect in most of the country and legitimate in a few places.
Additional insured and waiver requirements are unenforceable as written in some states under anti-indemnity statutes. A reviewer who does not know that will keep rejecting certificates for a clause that cannot be satisfied.
The distinction that matters most
A clean certificate with the endorsements on file, naming the right entity with the right scope, is a compliant file.
A clean certificate without the endorsements is an unverified file. Those are not the same condition, and unverified is the one that produces claims nobody planned for.
Related: additional insured vs. waiver of subrogation and why a COI gets rejected over notice of cancellation.